الإجراء:
تعديل لإضافة سبعة تخصيصات جديدة لحمولة النفايات القابلة للتحمل القصوى (TMDL) في حوض نهر جيمس (9VAC25-720-60 A) وحوض نهر تينيسي-بيغ ساندي (9VAC25-720-90 A)
الإجراء 6798
معلومات عامة
| ملخص الإجراء |
The amendments to 9VAC25-720, Water Quality Management Planning Regulation (WQMPR), include adding four new Total Maximum Daily Load (TMDL) wasteload allocations (WLA) in the James River Basin (9VAC25-720-60 A) and three new TMDL WLA in the Tennessee – Big Sandy River Basin (9VAC25-720-90 A). The TMDL WLAs were developed in accordance with Federal Regulations (40 CFR § 130.7) and are exempt from the provisions of Article II of the Virginia Administrative Process Act (§2.2-4006 A 14). The TMDL reports where WLAs are developed are subject to the TMDL public participation process, and the WLAs are adopted as part of 9VAC25-720 in accordance with the Department of Environmental Quality’s (DEQ) “Public Participation Procedures for Water Quality Management Planning” guidance (GM 23-2005).
|
| الفصول المتأثرة |
يؤثر فقط على هذا الفصل.
|
| مراجعة الفرع التنفيذي |
هذا الإجراء مستثنى من المادة 2 من قانون الإجراءات الإدارية، ولكنه يندرج ضمن الفرع التنفيذي وسيقوم مكتب الحاكم بمراجعته.
|
| مشروع RIS |
نعم [8297 ] |
| المراجعة الدورية الجديدة |
لن يتم استخدام هذا الإجراء لإجراء مراجعة دورية جديدة.
|
المراحل
المراحل المرتبطة بهذا الإجراء التنظيمي.
| معرّف المرحلة |
نوع المرحلة |
الحالة |
|
10830
|
النهائي
|
اكتملت المرحلة. أصبحت هذه اللائحة سارية المفعول في 10/08/2025. |
معلومات الاتصال
|
الاسم/المسمى الوظيفي:
|
جاستن ويليامز
|
|
العنوان:
|
1111 شرق الشارع الرئيسي، جناح 1400 P.O. صندوق 1105 ريتشموند، فيرجينيا 23218
|
|
عنوان البريد الإلكتروني
|
justin.williams@deq.virginia.gov
|
|
هاتف:
|
(804)659-1125 فاكس: ()- TDD: ()- : ()-
|
هذا الشخص هو جهة الاتصال الرئيسية لهذا الفصل.